Analisis Unsurfaced Road Condition Index Untuk Kualitas Jalan Tambang PT Antareja Mahada Makmur Kalimantan Timur
Analysis of Unsurfaced Road Condition Index for the Quality of Mining Roads of PT Antareja Mahada Makmur East Kalimantan
DOI:
https://doi.org/10.58227/jesta.v1i2.181Keywords:
DCP Test, geometry, road, slope, URCIAbstract
Overburden stripping is a process of removing overburden to extract the underlying minerals, and is an activity in the early stages of mining. A company that carries out mining activities must carry out stripping activities. The purpose of this study is to analyse the quality of haul roads using the URCI and CBR methods, analyse the obstacles that occur to provide recommendations for improvement, and provide recommendations for the thickness of road layers for overburden haul roads. The research method used is a quantitative method. Road geometry consists of straight road width, bend road width, road slope, superelevation and also crossfall. Based on the test results with the help of dynamic cone penetrometer test, it is known that the CBR value of 6 test points obtained values of 67.5, 42, 59.25, 70.90, 50 and 60, where the limit of good condition of a road based on percent CBR is 55 so that there are 2 roads that are not in good condition. Based on observations using the URCI method with 7 parameters, a value of 65 was obtained for 2 observation locations. Based on the observation results, it is known that in the three rock samples that have been soaked in water for three days, it is known that the material contained in HEX4035 is a material that dissolves quickly in water, resulting in mud. Meanwhile, the material in the mining front of HEX4036 and HEX1440 does not dissolve quickly in water so that the material can be a material for road layers as high as 9 inches for sub base and 7 inches for surface course.
References
Anisari. (2016). Produktivitas Alat Muat Dan Angkut Pada Pengupasan Lapisan Tanah Penutup Di Pit 8 Fleet D Pt. Jhonlin Baratama Jobsite Satui Kalimantan Selatan. Intekna.
Bps Kabupaten Kutai Timur. (2020). Kecamatan Bengalon Dalam Angka 2020. Kutai Timur: Bps Kabupaten Kutai Timur.
Buyung. (2018). Analisis Perbandingan Daya Dan Torsi Pada Alat Pemotong Rumput Elektrik (Apre). Voering.
Deniswara, W., Razak, S., & Hartono, A. (2023). Produktivitas Alat Gali Muat Berdasarkan Swing Angle Top Loading Dan Bottom Loading PT Cicatih Putra. Jurnal Inovasi Pertambangan dan Lingkungan, 3(1), 22-33.
Ferdiansyah, D. (2023). Penjadwalan Kerja Motor Grader Gd14m Menggunakan Metode Urci Untuk Peningkatan Produksi Alat Angkut Di Pit 2 Banko Barat Pt. Bukit Asam, Tbk, Tanjung Enim Sumatera Selatan. Transformation Of Mandalika.
Fikri, D. (2023). Pengaruh Total Resistance Terhadap Produktivitas Dump Truck Komatsu Ahs 785-7 Di Area Iup Ha Pt Semen Padang. Bina Tambang.
Hadi, D. (2020). Pengamatan Pola Muat Terhadap Produktivitas Alat Gali Muat Pada Pengupasan Lapisan Tanah Penutup. Poros Teknik, 91-98.
Hadi, I. A. (2022). Analisis Pengaruh Geometri Dan Kondisi Jalan Angkut Terhadap Produktivitas Dan Konsumsi Bahan Bakar Hauler Di Pt Antareja Mahada Makmur. Tangerang Selatan: Uin Syarif Hidayatullah Jakarta.
Halawa, A. (2021). Analisa Geometri Jalan Angkut Guna Meningkatkan Cycle Time Dan Produktivitas Alat Angkut Pada Kegiatan Pengupasan Overburden Dari Front Pengupasan Ke Disposal Area Pada Kegiatan Penambangan Batubara. Sains Dan Teknologi.
Hasanah, T. U. (2020). Penerapan Lean Manufacturing Dengan Metode Takt Time Dan Fmea Untuk Mengidentifikasi Waste Pada Proses Produksi Steril Di Industri Farmasi . Rekayasa Sistem Dan Industri.
Herlita, P. (2023). Analisis Kebutuhan Alat Muat Dan Alat Angkut Pada Kegiatan Penambangan Soil Di Area 242 Dengan Penerapan Metoda Antrian Untuk Memenuhi Target Produksi Clay 3000 Ton/Hari. Bina Tambang .
Hustrulid. (2013). Open Pit Mine Planning And Design. New York: Crc Press.
Ilham, S. (2020). Kajian Produksi Material Batuan Penutup (Overburden) Pada Pt Kaltim Batumanunggal Kabupaten Kutai Kartanegara Kalimantan Timur. Geologi Pertambangan.
Inggrid, M. J. (2016). Evaluasi Kemampuan Produksi Alat Gali-Muat Dan Alat Angkut Guna Mencapai Target Produksi Batubara 180.000 Ton Bulan Oktober 2015 Di Pit Limoa Tambang Air Laya Extentiontimur Pt Bukit Asam (Persero) Tbk Upte. Mineral, 1-9.
Komatsu. (2019). Komatsu Gd825. Japan: Komatsu.
Komatsu. (2020). Komatsu Hd 785-7. Japan: Komatsu.
Lengkong, P. (2013). Hubungan Nilai Cbr Laboratorium Dan Dcp Pada Tanah Yang Dipadatkan Pada Ruas Jalan Worilikupang Kabupaten Minahasa Utara. Sipil Statik, 368-376.
Maulana, N. Z. (2022). Pengaruh Geometri Jalan Tambang Terhadap Alat Angkut Kegiatan Pengupasan Overburden Penambangan Batubara Pt Tata Bara Utama Di Kabupaten Bayung Lencir, Provinsi Sumatera Selatan. Bandung Conference Series.
Mulyadi, L. (2016). Analisa Mutu Prasarana Jalan Perumahan Di Kabupaten Malang. Info Manpro.
Nurkhamim. (2023). Analisis Konsumsi Bahan Bakar Alat Angkut Ud Quester Cwe 370 Dalam Kegiatan Pengangkutan Bijih Nikel. Perhapi.
Oemiati, N. (2020). Analisa Produktivitas Alat Gali Muat Dan Alat Angkut Pada Pengupasan Lapisan Tanah Penutup (Overburden). Sipil.
Pratama, H. (2023). Efisiensi Produktivitas Peralatan Tambang Untuk Mencapai Terget Produksi Area (412 Ha) Pt Semen Padang (Persero) Tbk. Bina Tambang.
Putra, I. L. (2020). Evaluasi Kinerja Ban Hd 785-7 Dan 777 Pada Jalan Angkut Tambang Dari Front 2 Ke Crusher Iii A Dan Iii B Penambangan Batu Kapur Pt Semen Padang. Bina Tambang.
Ramadhan, M. D. (2023). Kajian Teknis Produksi Alat Muat Dan Alat Angkut Pada Kegiatan Penambangan Batubara. Perhapi.
Rizki, S. (2002). Perbandingan Rencana Tebal Perkerasan Jalan Tambang Dengan Metode Giroud-Han Dan Metode Aastho 1993 (Studi Kasus: Aceh Timur). Civil Engineering Student, 232-238.
Sahrul. (2023). Perancangan Geometri Jalan Tambang Pada Pt Aneka Nusantara Internasional Di Kecamatan Bunta Kabupaten Banggai Provinsi Sulawesi Tenah. Perhapi.
Sefrizni, A. (2023). Analisis Kebutuhan Alat Gali Muat Dan Alat Angkut Menggunakan Simulasi Teori Antrian Pada Produksi Overburden Di Pt Haswi Kencana Indah Kecamatan Sumay, Kabupaten Tebo, Provinsi Jambi. Bina Tambang.
Shiddiq, M. (2023). Studi Eksperimen, Penaruh Variasi Dimensi Ban Terhadap Keausan Ban. Teknologi Dan Pendidikan Vokasi Indonesia.
Sriharyani, L. (2016). Kajian Penggunaan Dynamic Cone Penetrometer (Dcp) Untuk Uji Lapangan Pada Tanah Dasar Pekerjaan Timbunan Apron (Studi Kasus Di Bandar Udara Radin Inten Ii Lampung). Tapak.
Suhendik, A. A. (2002). Studi Perbaikan Perkerasan Lapis Jalan Tambang Dengan Nilai Cbr Dan Dcp. Riset Teknik Pertambangan.
Suwandhi, A. (2004). Perencanaan Jalan Tambang. Bandung: Unisba.
Zakri, R. S. (2023). Analisis Geometri Jalan Tambang Area Loading Point Pit 2 Menuju Stockpile Terhadap Produktivitas Alat Angkut Fuso 220 Di Cv Dian Purnama, Kabupaten Sijunjung, Provinsi Sumatera Barat. Bina Tambang.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Journal of Engineering Science and Technology Applications
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.