Perhitungan Biaya Produksi Alat Muat dan Angkut di Pit Mudak PT Teknik Alum Service

Calculation Of Production Cost Of Loading And Hauling Equipment At Mudak Pit Of PT Teknik Alum Service

Authors

  • Adriansyah Wuriadin Lantapi Lantapi IAGI
  • Gina Audina P Alhabsyi Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Pejuang Republik Indonesia
  • Syarifullah Bundang Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Khairun
  • Vhalentio Pakombong Program Studi Teknik Geologi, Fakultas Teknik, Universitas Cenderawasih
  • Winarno Program Studi Teknik Geologi, Fakultas Teknik, Universitas Sulawesi Tenggara

DOI:

https://doi.org/10.58227/jesta.v3i1.212

Keywords:

Cost components, equipment cost calculations, production targets

Abstract

PT Teknik Alum Service is a company that mines nickel ore located in Buleleng.
Village, Bungku Pesisir District, Morowali Regency, Central Sulawesi Province. The costs of loading and transporting nickel from the mine to the jetty using loading and transportation equipment are carried out to determine the components of production operating costs. Production costs are costs incurred during the production process. To produce large tool productivity for the company, of course, it is necessary to calculate the production costs of using the tool based on the production target plan that has been determined by the company. From this identification, the objectives of this research are as
Follows: a. find out how much loading and conveyance equipment is produced at the Mudak Pit, b. Find out how much the production costs of loading equipment and conveyance are profitable for the company. PT Teknik Alum Service Teknik Alum Service has a monthly production target of 50,000 tons/month.

 

References

Arif, Irwandy, 2018, Nikel Indonesia. Gramedia Pustaka Utama

Astaty, 2019, PT Anugrah Alam Buana Indonesia Kabupaten Bombana Provinsi Sulawesi Tenggara Efisiensi Tentang Kerja Alat Mekanik untuk Mencapai Target Produksi Row Material.

Butt, C. R. M. & Zeegers, H., 1992, Regolith Exploration Geochemistry in Tropical and Subtropical Terrains. 1st ed. Amsterdam: Elsevier Science.

Fariq, M. A., Zaenal, Dan Yuliadi. 2016, Kajian Teknis Alat Gali-Muat Dan Alat Angkut Pada Kegiatan Penambangan Nikel Di PT. Antam (Persero) Tbk, Desa Buli Kecamatan Maba Kabupaten Halmahera Timur Provinsi Maluku Utara Technical Review Of Load-Drilling Equipment And Transport Tools In Nickel. Prosiding Teknik Pertambangan, Issn 2460-6499:52–62

Kadarusman, A., Miyashita, S., Maruyama, S., Parkinson, C.D., Ishikawa, A., 2004, Petrology, Geochemistry and Paleogeographic Reconstruction of the East Sulawesi Ophiolite, Indonesia, Tectonophysics 392:55-83.

Perdana, C. B. 2022., Estimasi Penentuan Jumlah Alat Muat Dan Alat Angkut Dalam Memenuhi Target Produksi Pada PT. Akar Mas Internasional Kecamatan Pomala Kabupaten Kolaka Provinsi Sulawesi Tenggara

Sefrizni, R. 2018, Analisis Kebutuhan Alat Gali Muat Dan Alat Angkut Menggunakan Simulasi Teori Antrian Pada Produksi Overburden Di PT. Haswi Kencana Indah Kecamatan Sumay, Kabupaten Tebo Provinsi Jambi. Universitas Negeri Padang. Padang

Setiawan, A. B, 2016, PT Sinar Krya Musti, Kecamatan Pulau Gebe, Kabupaten Halmahera Tengah, Studi Tentang Biaya Operasional Excavator JCB JS205LC Pengangkutan Bijih Nikel.

Silaban, Rosalina. 2020. Studi Estimasi Biaya Produksi Penambangan Antara Sewa Dengan Kepemilikan Alat Pada PT. Ariano Bintang Cemerlang, Site PT Ceria Nugraha Indotama Kabupaten Kolaka Provinsi Sulawesi Tenggara

Simandjuntak, T.O., Rusmana, E., Supandjono, J.B., Koswara, A. 1980. Peta Geologi Lembar Bungku, Sulawesi, Skala 1:250.000. Pusat Penelitian Dan Pengembangan Geologi, Bandung.

Suratman, 2000, Geology and Nikel Laterit Weathering Deposits in The South East Arm Of Sulawesi, Berita Sedimentology, Jakarta

Downloads

Published

2025-04-18