Analysis of Differences in Overburden Volume Calculation Results Based on Survey and Truck Count Method at PT Bina Sarana Sukses Job Site Manambang Muara Enim

Authors

  • Johanes Pauji Sihombing University of Bangka Belitung
  • Edwin Harsiga University of Bangka Belitung
  • Guskarnali Guskarnali University of Bangka Belitung

DOI:

https://doi.org/10.58227/jge.v4i2.326

Abstract

PT Bina Sarana is a coal mining contractor located in Darmo village and Pulau Panggung village. Lawang Kidul district, Muara Enim regency, South Sumatera province. The calculation of overburden volume using survey and truck count method on May is a 16,394.177 BCM, percentage 11.57. The aim of this study is to determine the volume of overburden transported based on survey and truck count method, analyze the casual factor and reparation. This study use quantitative method, overburden production on June and July is 910,304.25 BCM and truck count is 975.984,86 BCM. The identification of problem conducted sampling test to know the casual capacity of vessel,  CMT 96 is 23.26 BCM, CMT 106 is 25.30 BCM on June and CMT 96 is 23.21 BCM, CMT 106 is 24.87 BCM on July. The identification of problem used improving the calculation formula truck count, percentage routinely conducted sampling test to determine the actual capacity of vessel. The factor that influence of overburden volume known with survey and truck count method along June-July of 2024 are the discrepancy between actual load, the lack of bucket fill factor, the inaccurate of field survey data (inaccurate setting, tool centering, inaccuracy of detailed progress point). After the improvement, the result of overburden volume of truck count on June-July is 924,735.17 BCM, has a decrease in company’s calculation differences of 6.72 % to 1.5 % with the company determination 2.75 %.

References

Adiwarman, M. dkk. (2023). Analisis Perbandingan Volume Overburden Berdasarkan Data Survey Menggunakan Software Surpac 6.5.1 Dengan Data Truck Count Pada Pit Pandu PT Putra Muba Coal. JITS Vol. 1. No. 2, pp 100-105.

Anwar, H., Thamsi, A.B., Farid, M.F., 2021. Evaluasi Geometri Jalan Angkut Tambang Pada PT. Manakarra Multi Mining Provinsi Sulawesi Barat. Matriks Teknik Sipil 9, 7.

Aswadi, M., Husain, J.R., Gazali, A., Thamsi, A.B., 2022. Spread Of Laterite Nickel Based on Drill Data at PT Manunggal Sarana Surya Pratama, Southeast Sulawesi Province. Journal of Geology and Exploration 1, 51–57.

Dicky dkk, (2010). Laporan Praktikum Pemetaan Digital. Semarang: Teknik Geodesi Fakultas Teknik Universitas Diponegoro.

Hadi, S., Rizani, A, (2022). Perbandingan Volume Overburden Berdasarkan Hasil Pengukuran Metode Cut and Fill dengan Metode Truck Count. Jurnal Poros Teknik, Vol 15, No.1. Hal. 01-08 ISSN 2442-7764.

Kavanagh, B. F. (2000). Surveying: Principles and Applications. Prentice Hall.

Kurnia dkk, (2015). Evaluasi Penambangan di Pit 3 Bedasarkan Pengukuran Survey Kemajuan Tambang Terhadap Ritase Alat Angkut (Truck Count) pada PT Tanjung Alam Jaya Kecamatan Pengaron, Kabupaten Banjar, Kalimantan Selatan. Jurnal Geosapta 1, 5-7.

Manik dkk, (2022). Perbandingan Perhitungan Volume Overburden yang Terbongkar Antara Metode Truck Count dan Metode Survey Pada PT Adhipratama Ulok Kupai job site Bengkulu Utara. Jurnal Luar dan Dalam FTSP, 4(2), 210-220.

National Geodetic Survey (NGS), (2019). Geodetic surveying. U.S. Department of Commerce, National Oceanic and Atmospheric Administration, National Ocean Service. Diperoleh dari https://www.ngs.noaa.gov/PUBS_LIB/

Purwohardjo. (1986). “Kajian Teknis Pemanfaatan Potret Udara Non Metrik Format Kecil Pada Bidang Kehutanan”. Jurnal Manajemen Hutan Tropika Vol.7 No. 1. 55-64. Jakarta: Aerozone Australia.

Rahmy dan Maiyudi, (2021). Perbandingan Volume Overburden Berdasarkan Data Survey dengan Data Truck Count pada Pit Section 2 Timur PT Budi Gema Gempita Kabupaten Lahat, Sumatera Selatan. Jurnal Bina Tambang 6(5),97-106.

Rasyidi, I.M., & Ansosry. (2020). Perbandingan Volume Overburden Menggunakan Metode Cut and Fill Pada Pit Raja PT Rajawali Internusa Jobsite Muara Lawai PT Budi Gema Gempita, Lahat Provinsi Sumatera Selatan. Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Negeri Padang.Jurnal Bina Tambang. Vol.6, No. 3, 112-121. ISSN. 2302-3333

Rizky dkk, (2018). Pemanfaatan Terrestrial Laser Scanner Metode Clout To Clout untuk Earthmoving Tambang (Studi Kasus: PT Pama Persada Nusantara Distrik PT Trubaindo Coal Mining). Jurnal Geodesi UNDIP, 7(2), 21-30.

Rohmatullah, R. U. M, Yuwono & Kurniawan, A. (2020). Analisis Perbandingan Perhitungan Volume Bersih Galian dan Timbunan (Net Volume) dengan Metode Trapezoidal dan Borrow Pit Pada Perangkat Lunak Autocad Civil 3D. Journal of Geodesy and Geomatics, Vol. 16 No. 1, 106-120.

Tenriajeng. (2003). Pemindahan Tanah Mekanis (Alat-Alat Berat) Jakarta, Penerbit Guna Dharma.

Wolf, P. R., & Ghilani, C. D. (2006). Elementary Surveying: An Introduction to Geomatics. Prentice Hall.

Downloads

Published

2025-12-31

How to Cite

Sihombing, J. P., Harsiga, E., & Guskarnali, G. (2025). Analysis of Differences in Overburden Volume Calculation Results Based on Survey and Truck Count Method at PT Bina Sarana Sukses Job Site Manambang Muara Enim. Journal of Geology and Exploration, 4(2), 77–84. https://doi.org/10.58227/jge.v4i2.326