Comparative Analysis of Mined Reserve Tonnage on "M" Hill Between Mine Plan and Mining Realization

Authors

  • Djamaluddin Djamaluddin Universitas Hasanuddin
  • Mulhadramy Mulhadramy Universitas Muslim Indonesia
  • Nurliah Jafar Universitas Muslim Indonesia

DOI:

https://doi.org/10.58227/jge.v1i1.6

Keywords:

Material Movement, Mine Plan, Reserve, Overcut, Input Drill

Abstract

In mining activities, there is often a discrepancy between the plan and actual conditions in the field; if not identified early, this discrepancy will undoubtedly have the potential to cause losses if it continues to repeat itself. This study aimed to determine the factors driving the difference between the mine plan and mining realization. This research uses Pit design data, mine progress measurement data, material movement data, and two mine plan data, namely the backup plan model resulting from detailed exploration and the backup plan model data from the input drill results. From the results of the mine plan research, the closest to realization is the plan using input drill data with an average material movement difference of 10% and the difference in mined ore reserves an average of 12%. In comparison, detailed exploration data with an intermediate material movement difference of 12% to 42% and the contrast in mined ore reserves is 52% on average. The presence of overcuts influences this and the use of different densities.

References

Afriandi, D. (2015). Pemodelan Dan Estimasi Sumberdaya Nikel Laterit Daerah “X” Menggunakan Software Datamine Studio 3 Pada PT. Vale Indonesia Luwu Timur Sulawesi Selatan. Jurnal Geomine, 2(1). doi: 10.33536/jg.v2i1.32

Anwar, H., Thamsi, A. B., & Farid, M. F. (2021). Evaluasi Geometri Jalan Angkut Tambang Pada PT. Manakarra Multi Mining Provinsi Sulawesi Barat. Matriks Teknik Sipil, 9(1), 7. doi: 10.20961/mateksi.v9i1.47323

Anwar, H., Widodo, S., Alim, M. N., Umar, E. P., Lantara, D., Nurwaskito, A., & Thamsi, A. B. (2020). Analisis Losses pada Pemindahan Material Lgso di Front Penambangan Bukit Hilux Menuju Stockyard Pelabuhan PT Antam UBPN Sultra. Jurnal Geomine, 7(3), 218. doi: 10.33536/jg.v7i3.295

Dewanti, A. (2015). Analisis Produksi Material Sipil Dan Overburden Pada Disposal Area PT. Vale Indonesia, Tbk. Jurnal Geomine, 2(1). doi: 10.33536/jg.v2i1.26

Dzakir, L. O., Amir, M. K., Prianata, Y. L. O., & Kadar, M. I. (2022). Analisis Perbandingan Kadar MgO Dan SiO2 Pada Nikel Kadar Rendah di Kabupaten Kolaka dan Kabupaten Kolaka Utara. Jurnal Geomine, 10(1), 43–50. doi: 10.33536/jg.v10i4.1080

Febrylian, F.C. (2013). Rekonsiliasi Penambangan Antara Perencanaan tambang Jangka Pendek Dengan Realisasi Berdasarkan Block Model Dan Peta Topografi Periode Semester 1-2013 Di Site Tanjung Buli Ubp Nikel Maluku Utara, PT. Antam (Persero) Tbk. Prosiding TPT PERHAPI 2013, Yogyakarta. PERHAPI.

Jafar, N. (2016). Analisis Perbandingan Kandungan Unsur Nikel (Ni) Dan Besi (Fe) Dari Data Titik Bor Dengan Realisasi Penambangan. Jurnal Geomine, 4(2). doi: 10.33536/jg.v4i2.53

Hustrulid, W., and Kuchta, M. (1995). Open Pit Mine Planning and Design Volume 1 Fundamental, A.A. Brookfield, Netherland. Balkema.

Ibrahim, Eddy., Suawardi, F.R., dan Musmualim. (2014). Mining Reconciliation Between Monthly Mining Plan With Realization at Swakelola B2 Mine PT. Bukit Asam (Persero), Tbk. Palembang. Jurusan Teknik Pertambangan, Fakultas Teknik, Universitas Sriwijaya.

Mustika, R. (2016). Estimasi Sumberdaya Nikel Laterit Dengan Metode Inverse Distance Weighting (Idw) Pada PT. Vale Indonesia, Tbk. . Kecamatan Nuha Provinsi Sulawesi Selatan. Jurnal Geomine, 1(1). doi: 10.33536/jg.v1i1.11

Simanjuntak, T.O., Surono dan Sukido. (1993). Geologi Lembar Kolaka Sulawesi Tenggara, Bandung. Pusat Penelitian dan Pengembangan Geologi.

Syahputra, H. (2012). Rekonsiliasi Sequence Penambangan Perencanaan Jangka Panjang dengan Kondisi Aktual Studi Kasus Pit Selatan Tambang Senakin PT. Arutmin. Prosiding TPT PERHAPI 2012, Jakarta. PERHAPI.

Thamsi, A. B. (2017). Estimasi Cadangan Terukur Endapan Nikel Laterit Cog 2,0% Menggunakan Metode Inverse Distance Pada Pt. Teknik Alum Service, Blok X. Jurnal Geomine, 4(3), 128–130. doi: 10.33536/jg.v4i3.77

Thamsi, A. B., Jafar, N., & Fauzie, A. (2021). Analisis Pengaruh Morfologi Pada Pembentukan Nikel Laterit Pt Prima Sentosa Alam Lestari Kabupaten Morowali Provinsi Sulawesi Tengah. Jurnal GEOSAPTA, 7(2), 75–78. doi: 10.20527/jg.v7i2.9114

Widodo, S. (2015). Studi Perbandingan Antara Metode Poligon Dan Inverse Distance Pada Perhitungan Cadangan Ni PT. Cipta Mandiri Putra Perkasa Kabupaten Marowali. Jurnal Geomine, 3(1). doi: 10.33536/jg.v3i1.16

Yogi Pranata, R., Djamaluddin, D., Asmiani, N., & Thamsi, A. B. (2017). Analisis Perbandingan Kadar Nikel Berdasarkan Perencanaanterhadap Realisasi Penambangan. Jurnal Geomine, 5(3). doi: 10.33536/jg.v5i3.146

Downloads

Published

2022-06-30

How to Cite

Djamaluddin, D., Mulhadramy, M., & Jafar, N. (2022). Comparative Analysis of Mined Reserve Tonnage on "M" Hill Between Mine Plan and Mining Realization. Journal of Geology and Exploration, 1(1), 22–29. https://doi.org/10.58227/jge.v1i1.6