PT Bintang Sinar Perkasa plans to mine Pit C in Block B, Morowali Regency, Central Sulawesi. The pit covers approximately 20.98 hectares and contains an estimated 502,366 tonnes of ore. This study determines excavation and hauling equipment requirements and estimates ore getting costs. A quantitative approach combined field observations and company data, including equipment cycle times, haul-road geometry, production targets, equipment specifications, rental rates, fuel, lubricants, tyres, and operator wages. Theoretical productivity and equipment requirements were calculated for a 13-month production schedule. The results indicate a requirement for one Sany SY215C excavator for digging and one Sany SY365Hpro excavator for loading throughout the schedule. Hauling requires 14 Sany SYZ324C-8W(R) dump trucks during months 1–12 and eight units in month 13. Estimated equipment rental costs are IDR 15,141,085,714, while operating costs are IDR 40,001,619,838, resulting in total ore getting costs of IDR 55,142,705,552. These theoretical estimates provide a planning basis and require comparison with actual operating performance during mining.

References

Ananda, N.N., dan Anaperta, Y.M., 2019, Evaluasi Efisiensi Alat Gali-Muat Terhadap Produktivitas Setelah Delay Shift Change pada Pembongkaran Overburden Bulan Februari 2019 di Pit AB RTS ( Roto South ) Tambang Batubara PT . Bukit Makmur Mandiri Utama Jobsite PT . Kideco Jaya Agung. Jurnal Bina Tambang, 4(4), 0–8. ISSN: 2302-3333.

Asmiani, N., Puspitasari, A., & Widodo, S. (2017). Biaya Penambangan Nikel pada PT. Bintang Delapan Mineral Kabupaten Morowali Provinsi Sulawesi Tengah. Jurnal Geomine, 5(2).

Dania, Pratiwi. Evaluasi Biaya Kepemilikan (Owning Cost) dan Biaya Operasi (Operating Cost) Dump Truck Hino Ranger FF 173 MA pada Penambangan Batu Andesit di CV Panghegar, Blok Gunung Patapaan Desa Cilalawi, Kecamatan Sukatani, Kabupaten Purwakarta, Provinsi Jawa Barat. 2014. Universitas Islam Bandung.

Ercelebi, S.G., dan Bascetin, A., 2009, Optimization of Shovel-Truck System for Surface Mining, The Jurnal of the Southem African Insititute of Mining and Metallurgy. Vol. 109, Hal. 433-439.

Febrianti, D., & Zakia, Z. (2019). Analisis Durasi dan Perhitungan Biaya Penyusutan (Depresiasi) Alat Berat Excavator. Jurnal Teknik Sipil, 8(1), 69–78.

Febrianti, D., Zakia, Mawardi, E., 2021, Analisis Biaya Operasional Alat Berat pada Pekerjaan Timbunan, Journal of Civil Engineering. Vol. 10, No. 1, Hal. 33-49.

Franicha, F., Hidayat, S., dan Iskandar, T. 2017. Mining Equipment Analysis to Reach Target Production on Overburden in Kutai Kertanegara East Borneo, International Journal of Engineering Research and Applications (IJERA), Vol. 7, No.12, Hal. 36-44, ISSN: 2248-9622.

Hustrulid. M, Kuchta, R., & Martin. (2013). Open pit Mine Planning & Design (lo). CRC Press/Balkem. ISBN: 9781466575127.

Indonesianto, Y., 2016, Pemindahan Tanah Mekanis, Sekolah Tinggi Teknologi Nasional Yogyakarta, Yogyakarta, ISBN: 978-602-820607-5.

Jalil, K., dan Raza, S., 2019, Cost Estimation for Bench Drilling Phase of Diamond Wire Sawing Technique for Granite Mining, International Journal of Scientific and Research Publications (IJSRP), Vo. 9, No. 3, Hal. 455-464, ISSN: 2250-3153.

Kholil, A., 2014, Alat Berat, Bandung, PT. Remaja Rosdakarya, ISBN: 978-979-692-080- 8.

Kusrin, 2008, Pemindahan Tanah Mekanis dan Alat Berat, Semarang University Press, Semarang, ISBN: 978-979-3948-70-6.

Indonesia. 2020. Undang-undang Republik Indonesia Nomor 3 Tahun 2020. Jakarta.

Komatsu, 2019, Spesification & Application Handbook Edition 32, Japan.

Mohammadi, M., Rai, P., & Gupta, S., 2015, Performance Measurement of Mining Equipment, International Journal of Emerging Technology and Advanced Engmeering, Vol. 5, No. 7, Hal. 240-248, ISSN: 2250-2459.

Mohutsiwa, M., dan Musingwini, C., 2015, Parametric estimation of capital costs for establishing a coal mine: South Africa case study, Journal of the Southern African Institute of Mining and Metallurgy, Vol. 115, No. 8, Hal. 789-797, ISSN: 2411- 9717.

Mukiat., Asof, M., 2023. Analisis Investasi Tambang, Palembang, Awfa Smart Media, ISBN: 978-623-5357-07-8.

Nunnally, S. W., 2007, Construction methods and management, Pearson Prentice Hall, Columbus, ISBN: 0-13-171685-9.

Peurifoy, Robert. L., Schexnayder, C. J., & Shapira, Aviad, 2006, Construction planning, equipment, and methods, McGraw-Hill Higher Education, Austin, ISBN: 978-0- 07-110724-2.

Rostiyanti, S. F., 2008, Alat Berat untuk Proyek Konstruksi, PT. Rineka Cipta. Jakarta, Jakarta, ISBN: 978-979-518-850-6,

Subowo G. (2011). Penambangan Sistem Terbuka Ramah Lingkungan Dan Upaya Reklamasi Pasca Tambang Untuk Memperbaiki Kualitas Sumberdaya Lahan Dan Hayati Tanah. Jurnal Sumberdaya Lahan,

Suryawan, K.A., 2019, Manajemen Alat Berat, Deepublish, Yogyakarta, ISBN:978-623- 02-0212-4.

Winarso, W. (2014). Pengaruh biaya operasional terhadap profitabilitas (ROA) PT Industri Telekomunikasi Indonesia (PERSERO). Jurnal Ecodemica: Jurnal Ekonomi Manajemen dan Bisnis, 2(2), 258-271.

Downloads

Published

2026-11-10

How to Cite

Salam, A. (2026). Estimasi Biaya Ore Getting Bijih Nikel Blok B Pit C PT Bintang Sinar Perkasa Morowali. Journal of Mining Insight, 4(2). Retrieved from https://ejournal.insightpublisher.com/index.php/JMI/article/view/365

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.