Pembuatan Blok Model Estimasi Sumberdaya Nikel Laterit Dengan Metode Inverse Distance di Wilayah Blok “X” Pada PT. Vale Indonesia Tbk

Authors

  • Burhanudin Burhanudin Universitas Muslim Indonesia
  • Jamal Rauf Husain Universitas Hasanuddin
  • Hasbi Bakri Universitas Muslim Indonesia

DOI:

https://doi.org/10.58227/jmi.v1i1.41

Keywords:

Nickel laterite, block model, resources estimate, inverse distance, tonnage

Abstract

Block model is an attempt to produce estimates of mineral deposition wich is used as a reference for the mining process. The research objective to provide volume and tonnage estimation. The research method using conventional methods Inverse Dictance, needed the data among which the assay data, the data collar, geological data, and survey data. Research carried out by the number of drill point as much as 275 points and a drill spacing of 50 meters and 25 meters generate the amount of resources that have been calculated in the block model in the amount of resources that the limonite layer of 1,210,938 tonnes with the average levels of Ni: 0.8%, Co: 0.08%, Fe: 42.3%, SiO2: 7.8% and MgO: 1.21%. And for saprolite tonnage of 445,090 tonnes with the average levels of Ni: 1.91%,Co:0.18%, Fe: 32.78%, SiO2: 25% and MgO: 7.08%.

References

Ahmad. W. (2002). Chemistry Mineralogy and Formation of Nickel Laterite. PT. Inco, Indonesia.

Gencom Company. (2007). Tutorial Surpac. Gencom, Australia.

Golightly. (1978). Nickeliferous Laterites: A General Description, PT. International Nickel Indonesia, Sorowako.

Golightly. (1979). Geology Of Sorowako Nickelifraous Laterit Deposit. INCO Metals Compayn, Seridan Park, Canada.

Harianto, S. (2003). Nikel Laterit. Tim Eksplorasi Nikel Lasolo – Sultra Unit Geomin Jakarta.

Osborne, R. C & Waraspati, D. (1986). Applied mine geology at PT. Inco, Soroako, South Sulawesi, Indonesia. XV Annual Convention of the Association of Indonesian Geologists. Yogyakarta, Desember 1986.

PT. Bintangdelapan Mineral, Tim Eksplorasi Nikel. Laporan. Arsip perusahaan yang diperbolehkan untuk dibaca. Bahodopi.

Rauf, A. (1998). Perhitugan Sumberdaya Endapan Mineral. Jurusan Teknik Pertambangan UPN, Yogyakarta.

Santos, R.A. (2012). Exploration and Resource Estimation of Nickel Laterit Deposite. Report of Exploration Result. Philippine.

Simanjuntak. (1991). Melakukan Penelitian dengan skala 1:25000 yang Menghasilkan lembar Beteleme.

Downloads

Published

2023-01-31

How to Cite

Burhanudin, B., Rauf Husain, J., & Bakri, H. (2023). Pembuatan Blok Model Estimasi Sumberdaya Nikel Laterit Dengan Metode Inverse Distance di Wilayah Blok “X” Pada PT. Vale Indonesia Tbk. Journal of Mining Insight, 1(1), 26–33. https://doi.org/10.58227/jmi.v1i1.41